Shared Use Path" rail-with-trail:
Planned by MDOT from Ellsworth Falls to Spring Street in Downtown Ellsworth for 2010 Construction.
Rail with Trail Connector Project:
Spring Street to High Street area on City Streets, perhaps to end at the proposed STAR Center.
Downeast Sunrise Trail Ellsworth:
High Street area to Washington Jct. Segment to be designed by MDOT in 2010. See DEST below.
Downeast Sunrise Trail (DEST) (mostly completed in 2009):
Washington Jct. to Ayers Jct. in Pembroke
MDOT Trail Planning website:
Brewer to Calais rail-with-trail
Union River Connector Project
A proposed multi-use bridge north of Leonard Lake to connect the Downeast Trail to points west.



