Michele Gagnon
City Planner
207-669-6608
mgagnon@ellsworthmaine.gov

Elena Piekut
Assistant Planner
207-669-6615
epiekut@ellsworthmaine.gov

Planning Office located in Ellsworth City Hall at 1 City Hall Plaza.

Banner
Woodlawn_entry_Jef.jpg
Home Transportation Rail-Trail Segments
Transportation

Rail-Trail Segments

Shared Use Path" rail-with-trail:
Planned by MDOT from Ellsworth Falls to Spring Street in Downtown Ellsworth for 2010 Construction.

Rail with Trail Connector Project:
Spring Street to High Street area on City Streets, perhaps to end at the proposed STAR Center.

Downeast Sunrise Trail Ellsworth:
High Street area to Washington Jct. Segment to be designed by MDOT in 2010. See DEST below.

Downeast Sunrise Trail (DEST) (mostly completed in 2009):
Washington Jct. to Ayers Jct. in Pembroke

MDOT Trail Planning website:
Brewer to Calais rail-with-trail

Union River Connector Project
A proposed multi-use bridge north of Leonard Lake to connect the Downeast Trail to points west.

 

Privacy Policy

Copyright © 2014 City of Ellsworth, Maine. All Rights Reserved.